Week of |
No. Weeks |
Lab Title |
Downloads |
Point Value |
January 15 |
1 |
Introduction to oscilloscope, function generator, digital multi-meter (DMM), and curve fitting. |
||
January 22 |
1 |
Transients in RLC circuits |
50 |
|
January 29 |
1 |
Frequency domain analysis of linear circuits using synchronous detection RLC lab report should be submitted electronically not later than midnight of your Lab day. Notebooks should be submitted in the beginning of the Lab section |
|
100 |
February 5 |
1 |
Pulses in transmission lines Frequency analysis lab report should be submitted electronically not later than midnight of your Lab day. Notebooks should be submitted in the beginning of the Lab section |
100 |
|
February 12 |
1 of 2 |
Millikan Oil Drop Experiment / Week 1 Transmission lines lab report should be submitted electronically not later than midnight of your Lab day. Notebooks should be submitted in the beginning of the Lab section |
Millikan1 (right-click to download project file) |
100 |
February 19 |
2 of 2 |
Millikan Oil Drop Experiment / Week 2 |
|
|
February 26 |
1 of 2 |
Torsion Oscillator / Week 1 Millikan oil drop lab report should be submitted electronically not later than midnight of your Lab day. Notebooks should be submitted in the beginning of the Lab section |
100 |
|
March 5 |
2 of 2 |
Torsion Oscillator / Week 2 |
|
|
March 12 |
1 |
Hall Probe Measurement of Magnetic Fields
Torsion oscillator lab report should be submitted electronically not later than midnight of your Lab day. Notebooks should be submitted in the beginning of the Lab section |
|
100 |
March 19 |
Spring Break |
|||
March 26 |
1 of 2 |
Qualitative Studies with Microwaves / Week 1
Torsion oscillator lab report should be submitted electronically not later than midnight of your Lab day. Notebooks should be submitted in the beginning of the Lab section |
|
150 |
April 2 |
2 of 2 |
Microwave Cavities / Week 2 |
||
April 9 |
1 of 3 |
Final Project - AC Measurement of Magnetic Susceptibility / Week 1 Microwave lab report should be submitted electronically not later than midnight of your Lab day. Notebooks should be submitted in the beginning of the Lab section |
300 |
|
April 16 |
2 of 3 |
Final Project - AC Measurement of Magnetic Susceptibility / Week 2 |
|
|
April 23 |
3 of 3 |
Final Project - AC Measurement of Magnetic Susceptibility / Week 3. |
|
|
May 9 |
Final week: Final Project Reports due on May 9th at 11:59 PM. Reports should be submitted by uploading. |
Total 1000 |