|
Homeworks should be submitted via Compass by the end of the day on the due date.
Grades and comments are recorded through Compass.
Date |
Assignment |
Due Date | Answers | |
8/23/2010 | Introduction interest survey and HW1 (pdf) | 8/30/2010 | Answers and comments | |
9/1/2010 | Security Policy, Risk Analysis, and Cryptography (pdf) Note a typo was found in the ciphertext in 3b. The 30th chararacter should be a U not a V. That is the ciphertext should be TQCRNXMDEHADHUKOFJPOREZOEIBWOUEVTLYG. A corrected assignment has been uploaded. | 9/8/2010 | Comments on the assignment | |
9/10/2010 | Symetric Cryptography and Stream Ciphers (pdf) | 9/17/2010 | Comments on the assignment | |
9/13/2010 | 4th credit projects | 10/6/2010 project proposals due 12/9/2010 final project due |
||
9/20/2010 | Public key encryption, crypto hashes, and key management (pdf) |
9/27/10 Late handin period ends October 1, so we can make answers available in time for study for exam. Comments on the assignment |
||
10/18/2010 | Database security and access controls (pdf) | 10/25/2010 | Comments on the assignment | |
10/27/2010 | Trusted systems evaluation, assurance, and design (pdf) | 11/3/2010 | Comments on the assignment | |
11/5/2010 | Malware and network security (pdf) | 11/12/2010 with no late turn in period to ensure availability of answers for study before exam 2 | Comments on the assignment |